{"id":110,"date":"2021-09-12T13:55:00","date_gmt":"2021-09-12T11:55:00","guid":{"rendered":"https:\/\/frazconstruction.wordpress.com\/?p=110"},"modified":"2021-12-29T15:20:05","modified_gmt":"2021-12-29T14:20:05","slug":"cooldown-manager-wheatstone-project","status":"publish","type":"post","link":"https:\/\/frazconstruction.com\/index.php\/2021\/09\/12\/cooldown-manager-wheatstone-project\/","title":{"rendered":"Cooldown Manager (Wheatstone Project)"},"content":{"rendered":"\n<p class=\"has-text-align-left\"><em>October 2017 till November 2017<\/em><\/p>\n\n\n\n<p class=\"has-text-align-justify\">Coodldown manager for Entrepose Projets (EPC) for the Wheatstone Project (Chevron), Autralia (2 LNG Storage Tanks 180000m3). On this assignment, I was responsible to assist the Operators in the implementation and follow up of HSE and Quality System for the overall Cool-down activities of the 2 LNG storage tanks and associated piping. <\/p>\n\n\n\n<p class=\"has-text-align-justify\">As such, I was responsible to provide all necessary technical support and system operation key information to Operators to ensure a smooth  and controlled cool-down operation. In addition, it was under my responsibility to provide adequate responses for any unforeseen events linked to the start-up of the new plant interfering with the Cool-down operation to ensure proper protection of the integrity of the overall system.<\/p>\n\n\n\n<p>Want to know more? Do not hesitate to <a href=\"https:\/\/frazconstruction.com\/index.php\/contact\/\"><span class=\"has-inline-color has-vivid-cyan-blue-color\">#contact me<\/span><\/a>!<\/p>\n","protected":false},"excerpt":{"rendered":"<p>October 2017 till November 2017 Coodldown manager for Entrepose Projets (EPC) for the Wheatstone Project (Chevron), Autralia (2 LNG Storage Tanks 180000m3). On this assignment, I was responsible to assist the Operators in the implementation and follow up of HSE and Quality System for the overall Cool-down activities of the 2 LNG storage tanks and<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1],"tags":[],"class_list":["post-110","post","type-post","status-publish","format-standard","hentry","category-non-classe"],"_links":{"self":[{"href":"https:\/\/frazconstruction.com\/index.php\/wp-json\/wp\/v2\/posts\/110","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/frazconstruction.com\/index.php\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/frazconstruction.com\/index.php\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/frazconstruction.com\/index.php\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/frazconstruction.com\/index.php\/wp-json\/wp\/v2\/comments?post=110"}],"version-history":[{"count":3,"href":"https:\/\/frazconstruction.com\/index.php\/wp-json\/wp\/v2\/posts\/110\/revisions"}],"predecessor-version":[{"id":417,"href":"https:\/\/frazconstruction.com\/index.php\/wp-json\/wp\/v2\/posts\/110\/revisions\/417"}],"wp:attachment":[{"href":"https:\/\/frazconstruction.com\/index.php\/wp-json\/wp\/v2\/media?parent=110"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/frazconstruction.com\/index.php\/wp-json\/wp\/v2\/categories?post=110"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/frazconstruction.com\/index.php\/wp-json\/wp\/v2\/tags?post=110"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}