My background


As each experience is a new story, find a little more below


  • Package Manager (LNG Canada Project)

    January 2021 – July 2021 Off-site Package Manager for Entrepose Contracting/Vinci Construction Grand Projets for the LNG Canada Project (one 200 000m3 LNG tank) in Vila Seca, Spain. Located in the workshops of our Subcontractor, I add under my responsibility to ensure the implementation and follow up of HSE & Quality System and Coordination of the

  • Site manager (Aquarius Project)

    March 2018 till January 2021 Site Manager for Entrepose Contracting for the Aquarius Project, France. This project saw the erection of an Island Berth for White product unloading and transfer to an Existing Terminal. It was comprised of several activities including 800 000m3 dredging to allow 2 unloading arms installation on Concrete platform and Berthing along

  • Tendering Manager (LNG Canada Project)

    November 2017 till March 2018 Tendering Manager for Entrepose Contracting (EPC) on an LNG Storage EPC (all discipline) project tender for one LNG tank 200 000 m3 (LNG Canada Project). As such, I add the responsibility to revise the actual tender both technically and financially with our partner for submission to several Main Contractors bidding on

  • Cooldown Manager (Wheatstone Project)

    October 2017 till November 2017 Coodldown manager for Entrepose Projets (EPC) for the Wheatstone Project (Chevron), Autralia (2 LNG Storage Tanks 180000m3). On this assignment, I was responsible to assist the Operators in the implementation and follow up of HSE and Quality System for the overall Cool-down activities of the 2 LNG storage tanks and

  • Site Management Advisor

    February 2017 till September 2017 Site Management Advisor for Entrepose Projets (EPC) in Tender Department to assist on multiple tenders. The range of tenders varied from LPG storage EPC Projects, FSRU Jetty EPC Projects, LNG liquefaction and Storage EPC Projects, Spheres EPC Projects to Tank Farm EPC project. These tenders also including various organisation with

  • Site Manager (Toren & Gazdepo Projects)

    November 2016 till February 2017 Site Manager for Entrepose Projets (EPC) for the 3D Seismic Survey (43 km²) and 2D Seismic Survey (66 km) on the Toren and Gazdepo Project in Tarsus, Turkey. The objective of the Seismic surveys was to aggregate additional geological information for the Development of Underground Salt Caverns for up to

  • Site Manager (Dunkerque LNG Project)

    June 2016 till October 2016 Site Manager (Construction, Pre-commissioning, Commissioning, Cooldown and Start-up) for Entrepose Projets (EPC) on the Dunkerque Liquified Natural Gas Terminal (EDF, TOTAL, FLUXYS), France (three LNG tanks 190000 m3). In the continuity of the Construction Manager works for the external works, I was in charge on this particular time of Project

  • Contruction Manager (Dunkerque LNG Project

    November 2012 till May 2016 Construction Manager (Mechanical, Piping, E&I) for Entrepose Projets (EPC) on the Dunkerque Liquified Natural Gas Terminal (EDF, TOTAL, FLUXYS), France (three LNG tank 190000 m3). Implementation and follow up of HSE and Quality System by Subcontractors and all external activities preparation, scheduling and coordination. I was in charge on this

  • Construction Manager (New LNG Train Skikda Project)

    August 2008 till November 2012 Construction Manager (Civil, Piping, Mechanical, E&I) for Entrepose Contracting (EPC) & Entrepose Projets (EPC) on the New LNG Train Skikda Project – Field Erected Tanks (KBR, SONATRACH), Algeria (one LNG tank 150000 m3 as per API 620, 2 LPG tanks 66000 m3 as per API 620, one Sphere 3000m3 as

  • Construction Manager (Train Six NLNG Project)

    April 2007 till August 2008 Civil, E&I, Piping Construction Manager for Entrepose Contracting (EPC) on the NLNG Project (SHELL), Nigeria (one Condensate tank 36000 m3, one LNG tank 75300 m3 & 2 LPGs 65000 m3). Follow up, scheduling and coordination of all external activities and system completion (construction, pre-commissioning and commissioning) till Ready for Start

  • Civil Engineer (Train Six NLNG Project)

    September 2005-April 2007 Civil engineer for Entrepose Contracting (EPC) on the NLNG Project (SHELL), Nigeria in charge of Civil contractor follow up for all civil works (one Condensate tank 36000 m3, one LNG tank 75300 m3 & 2 LPGs 65000 m3). Checking and application by Civil entity of Client specifications and norms such as BS

  • Primavera Planning report coordinator (Sangachal Terminal Project)

    March 2005 till July 2005 Primavera Planning report coordinator for Azerbaijan International Operating Company operated by British Petroleum on the Sangachal Terminal (>500 M$), Azerbaijan

  • Contruction Manager (Sangachal Terminal Project)

    July 2004 till September 2004 Construction Manager for CMP Dunkerque to supervise the remedial work for the foundation of two crude oil tanks (125000 m3) on the Sangachal Terminal (BP), Azerbaijan

  • Construction Trainee (LNG Tanks Sines Project)

    August 2003 Construction trainee for CMP Dunkerque to supervise and improve the procedure of the nitrogen filling of two Liquefied Natural Gas tanks (120000 m3) on the site of Sines, Portugal.

  • Quality Control Trainee (Melkøya Project)

    July 2003 Quality control trainee in civil work for Entrepose Contracting on LNG tanks (two 125000 m3 LNG tanks, one 45000 m3 LPG tank and one 75000 m3 condensate tank) project on the site of the island of Melkøya (STATOIL), Norway.