Package Manager (LNG Canada Project)

Package Manager (LNG Canada Project)

January 2021 – July 2021

Off-site Package Manager for Entrepose Contracting/Vinci Construction Grand Projets for the LNG Canada Project (one 200 000m3 LNG tank) in Vila Seca, Spain. Located in the workshops of our Subcontractor, I add under my responsibility to ensure the implementation and follow up of HSE & Quality System and Coordination of the overall planned activities to launch the preparation, prefabrication, assembly till commissioning of the package corresponding to the Main Platform elements and Secondary elements of the Tank. These package included Temporary and Main structures (1700 mT), piping (31 000 inches), insulation, electricity and instrumentation activities as per Canadian Standards (Canadian Welding Bureau certification, Professional Engineers audit…).

Once preparations were on the way, we did kick in the temporary work activities in view of the imminent start of the Main Platforms activities. These temporary works would lead to the necessary supporting structures required to erect the Main Platform modules.

Want to know more? Do not hesitate to #contact me!

Leave a Reply

Your email address will not be published. Required fields are marked *