Cooldown Manager (Wheatstone Project)

Cooldown Manager (Wheatstone Project)

October 2017 till November 2017

Coodldown manager for Entrepose Projets (EPC) for the Wheatstone Project (Chevron), Autralia (2 LNG Storage Tanks 180000m3). On this assignment, I was responsible to assist the Operators in the implementation and follow up of HSE and Quality System for the overall Cool-down activities of the 2 LNG storage tanks and associated piping.

As such, I was responsible to provide all necessary technical support and system operation key information to Operators to ensure a smooth and controlled cool-down operation. In addition, it was under my responsibility to provide adequate responses for any unforeseen events linked to the start-up of the new plant interfering with the Cool-down operation to ensure proper protection of the integrity of the overall system.

Want to know more? Do not hesitate to #contact me!

Leave a Reply

Your email address will not be published. Required fields are marked *