Contruction Manager (Sangachal Terminal Project)

Contruction Manager (Sangachal Terminal Project)

July 2004 till September 2004

Construction Manager for CMP Dunkerque to supervise the remedial work for the foundation of two crude oil tanks (125000 m3) on the Sangachal Terminal (BP), Azerbaijan