October 2017 till November 2017
Coodldown manager for Entrepose Projets (EPC) for the Wheatstone Project (Chevron), Autralia (2 LNG Storage Tanks 180000m3). On this assignment, I was responsible to assist the Operators in the implementation and follow up of HSE and Quality System for the overall Cool-down activities of the 2 LNG storage tanks and associated piping.
As such, I was responsible to provide all necessary technical support and system operation key information to Operators to ensure a smooth and controlled cool-down operation. In addition, it was under my responsibility to provide adequate responses for any unforeseen events linked to the start-up of the new plant interfering with the Cool-down operation to ensure proper protection of the integrity of the overall system.
Want to know more? Do not hesitate to #contact me!